
New TopShim run:

version = topshim 2.4.0
date = 2026-09-25
time = 22:31:25.782
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.0 Hz, Target= 0.6 Hz, After= 1.6 Hz
Iteration  2: FWHM Before= 1.6 Hz, Target= 1.1 Hz, After= 1.3 Hz
Iteration  3: FWHM Before= 1.3 Hz, Target= 1.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.57

shim changes: 
Z	-7
Z2	-37
Z3	+47
Z4	+793

duration = 2 min 54 sec
completed successfully
finished Fri Sep 25 22:34:18 2026


========================================================================
