
New TopShim run:

version = topshim 2.4.0
date = 2026-10-30
time = 16:21:48.843
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 3.5 Hz, Target= 0.3 Hz, After= 1.6 Hz
Iteration  2: FWHM Before= 1.6 Hz, Target= 0.3 Hz, After= 1.2 Hz
Iteration  3: FWHM Before= 1.2 Hz, Target= 0.5 Hz, After= 0.5 Hz
Iteration  4: FWHM Before= 0.5 Hz, Target= 0.5 Hz, After= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.682

shim changes: 
Z	-397
Z2	+491
Z3	-2492
Z4	+8203

duration = 3 min 11 sec
completed successfully
finished Fri Oct 30 16:24:58 2026


========================================================================
