
New TopShim run:

version = topshim 2.4.0
date = 2026-09-25
time = 16:55:35.213
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
echo time must be reduced
Iteration  1: FWHM Before= 2.5 Hz, Target= 0.3 Hz, After= 1.4 Hz
Iteration  2: FWHM Before= 1.4 Hz, Target= 0.4 Hz, After= 2.5 Hz
Iteration  3: FWHM Before= 2.5 Hz, Target= 1.6 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.06

shim changes: 
Z	-23
Z2	-14
Z3	-68
Z4	-242

duration = 8 min 10 sec
completed successfully
finished Fri Sep 25 17:03:43 2026


========================================================================
