
New TopShim run:

version = topshim 2.4.0
date = 2026-10-29
time = 20:18:13.950
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.6 Hz, Target= 0.9 Hz, After= 1.4 Hz
Iteration  2: FWHM Before= 1.4 Hz, Target= 0.9 Hz, After= 1.1 Hz
Iteration  3: FWHM Before= 1.1 Hz, Target= 1.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.25

shim changes: 
Z	-20
Z2	+108
Z3	-22
Z4	-690

duration = 2 min 15 sec
completed successfully
finished Thu Oct 29 20:20:27 2026


========================================================================
