
New TopShim run:

version = topshim 2.4.0
date = 2026-09-25
time = 13:39:08.958
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.7 Hz, Target= 1.5 Hz, After= 1.9 Hz
Iteration  2: FWHM Before= 1.9 Hz, Target= 1.4 Hz, After= 1.4 Hz
Iteration  3: FWHM Before= 1.4 Hz, Target= 1.4 Hz, After= 2.1 Hz
Iteration  4: FWHM Before= 2.1 Hz, Target= 1.1 Hz, After= 1.1 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.55

shim changes: 
Z	-44
Z2	-42
Z3	+241
Z4	-374

duration = 5 min 20 sec
completed successfully
finished Fri Sep 25 13:44:27 2026


========================================================================
