
New TopShim run:

version = topshim 2.4.0
date = 2026-10-07
time = 21:46:49.217
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.3 Hz, Target= 0.3 Hz, After= 1.0 Hz
Iteration  2: FWHM Before= 1.0 Hz, Target= 0.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.477

shim changes: 
Z	-52
Z2	-38
Z3	+131
Z4	+601

duration = 2 min 14 sec
completed successfully
finished Wed Oct 07 21:49:02 2026


========================================================================
