
New TopShim run:

version = topshim 2.4.0
date = 2026-09-22
time = 19:26:38.917
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 3.0 Hz, Target= 1.6 Hz, After= 1.3 Hz
Iteration  2: FWHM Before= 1.3 Hz, Target= 1.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.936

shim changes: 
Z	-50
Z2	-30
Z3	-5
Z4	-23

duration = 2 min 17 sec
completed successfully
finished Tue Sep 22 19:28:54 2026


========================================================================
