
New TopShim run:

version = topshim 2.4.0
date = 2026-10-09
time = 23:03:01.492
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.0 Hz, Target= 1.5 Hz, After= 1.6 Hz
Iteration  2: FWHM Before= 1.6 Hz, Target= 1.7 Hz, After= 2.3 Hz
Iteration  3: FWHM Before= 2.3 Hz, Target= 1.7 Hz, After= 1.6 Hz
Iteration  4: FWHM Before= 1.6 Hz, Target= 1.5 Hz, After= 1.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.96

shim changes: 
Z	-37
Z2	-65
Z3	-380
Z4	-528

duration = 3 min 48 sec
completed successfully
finished Fri Oct 09 23:06:48 2026


========================================================================
