
New TopShim run:

version = topshim 2.4.0
date = 2026-09-29
time = 12:23:15.925
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 3.6 Hz, Target= 3.2 Hz, After= 2.9 Hz
Iteration  2: FWHM Before= 2.9 Hz, Target= 2.2 Hz, After= 2.1 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 2.13

shim changes: 
Z	+33
Z2	+431
Z3	+314
Z4	-2894

duration = 4 min 11 sec
completed successfully
finished Tue Sep 29 12:27:25 2026


========================================================================
