
New TopShim run:

version = topshim 2.4.0
date = 2026-09-29
time = 12:31:08.985
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 7.1 Hz, Target= 0.5 Hz, After= 0.8 Hz
Iteration  2: FWHM Before= 0.8 Hz, Target= 0.5 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.04

shim changes: 
Z	+129
Z2	-288
Z3	+3
Z4	+3976

duration = 2 min 16 sec
completed successfully
finished Tue Sep 29 12:33:23 2026


========================================================================
