
New TopShim run:

version = topshim 2.4.0
date = 2026-10-02
time = 00:19:24.172
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.6 Hz, Target= 1.1 Hz, After= 1.3 Hz
Iteration  2: FWHM Before= 1.3 Hz, Target= 1.6 Hz, After= 1.6 Hz
Iteration  3: FWHM Before= 1.6 Hz, Target= 1.3 Hz, After= 1.6 Hz
Iteration  4: FWHM Before= 1.6 Hz, Target= 1.1 Hz, After= 1.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.53

shim changes: 
Z	+22
Z2	+22
Z3	-201
Z4	-1076

duration = 6 min 23 sec
completed successfully
finished Fri Oct 02 00:25:45 2026


========================================================================
