
New TopShim run:

version = topshim 2.4.0
date = 2026-10-29
time = 21:42:31.716
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 0.9 Hz, Target= 0.5 Hz, After= 1.6 Hz
Iteration  2: FWHM Before= 1.6 Hz, Target= 1.0 Hz, After= 1.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.08

shim changes: 
Z	+31
Z2	+50
Z3	+52
Z4	-380

duration = 2 min 14 sec
completed successfully
finished Thu Oct 29 21:44:44 2026


========================================================================
