
New TopShim run:

version = topshim 2.4.0
date = 2026-10-08
time = 11:10:14.064
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before=11.0 Hz, Target= 2.5 Hz, After= 7.0 Hz
Iteration  2: FWHM Before= 7.0 Hz, Target= 0.2 Hz, After= 1.7 Hz
Iteration  3: FWHM Before= 1.7 Hz, Target= 0.3 Hz, After= 2.4 Hz
Iteration  4: FWHM Before= 2.4 Hz, Target= 1.5 Hz, After= 1.9 Hz
Iteration  5: FWHM Before= 1.9 Hz, Target= 1.5 Hz, After= 1.6 Hz
Iteration  6: FWHM Before= 1.6 Hz, Target= 0.5 Hz, After= 1.1 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 2.21

shim changes: 
Z	+2125
Z2	+4184
Z3	+10954
Z4	+17889

duration = 8 min 39 sec
completed successfully
finished Thu Oct 08 11:18:51 2026


========================================================================
