
New TopShim run:

version = topshim 2.4.0
date = 2026-10-28
time = 13:07:04.201
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.3 Hz, Target= 0.5 Hz, After= 0.9 Hz
Iteration  2: FWHM Before= 0.9 Hz, Target= 2.3 Hz, After= 1.0 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 2.19

shim changes: 
Z	+49
Z2	+187
Z3	-329
Z4	-31

duration = 3 min 31 sec
completed successfully
finished Wed Oct 28 13:10:34 2026


========================================================================
