
New TopShim run:

version = topshim 2.4.0
date = 2026-10-28
time = 17:58:13.371
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.5 Hz, Target= 1.5 Hz, After= 2.4 Hz
Iteration  2: FWHM Before= 2.4 Hz, Target= 0.4 Hz, After= 0.8 Hz
Iteration  3: FWHM Before= 0.8 Hz, Target= 1.6 Hz, After= 1.7 Hz
Iteration  4: FWHM Before= 1.7 Hz, Target= 1.1 Hz, After= 1.9 Hz
Iteration  5: FWHM Before= 1.9 Hz, Target= 0.9 Hz, After= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.67

shim changes: 
Z	-19
Z2	+109
Z3	+73
Z4	-1440

duration = 3 min 39 sec
completed successfully
finished Wed Oct 28 18:01:51 2026


========================================================================
