
New TopShim run:

version = topshim 2.4.0
date = 2026-10-07
time = 14:58:43.726
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.6 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.613

shim changes: 
Z	-30
Z2	+12
Z3	+167
Z4	+279

duration = 2 min 15 sec
completed successfully
finished Wed Oct 07 15:00:57 2026


========================================================================
